Mickoski: 400 kV transmission line from TS “Bitola 2” marks first time country is fully connected to all neighboring power systems
- Prime Minister Hristijan Mickoski, who attended Thursday a cornerstone laying ceremony for a 400 kV transmission line from Transmission Substation (TS) “Bitola 2” to the Kjafasan border crossing on the Macedonian-Albanian border, said the project marks the first time that the country is fully connected to all neighboring power systems, which brings more security for citizens, more stability for the economy and more opportunities for development.
- Post By Nevenka Nikolik
- 15:03, 2 April, 2026
You need to login to view this page en