Bozhinovska - Đedović Handanović: Macedonia - Serbia gas interconnector to be completed by end of 2027
Belgrade, 12 December 2025 (MIA) – The gas interconnector linking Serbia and North Macedonia is slat...
Belgrade, 12 December 2025 (MIA) – The gas interconnector linking Serbia and North Macedonia is slat...
Skopje, 9 July 2025 (MIA) – The construction has started Wednesday on the 66.7 km gas interconnector...
Skopje, 7 May 2025 (MIA) – Natural gas transmission operator NOMAGAS Skopje and Kumanovo-based const...
Skopje, 30 September 2022 (MIA) - After being invited by Bulgarian President Rumen Radev, President Ste...
Skopje, 23 December 2021 (MIA) – North Macedonia has secured funds for the implementation of the projec...
Mia.mk користи колачиња
Ние користиме колачиња за да го подобриме вашето искуство со прелистување, да опслужуваме персонализирани реклами или содржини и да го анализираме нашиот сообраќај. Со кликнување на „Прифати“, се согласувате со нашата употреба на колачиња.
This material may not be stored, published, broadcast, rewritten or redistributed in any form, except with the prior express permission of Media Information Agency. Every intrusion and abuse of MIA website is penalized in line with Articles 251 and 251a of the Criminal Code of the Republic of North Macedonia. Legal consultant and representative: Lawyer Milena Veljanovska - Stoilovska.
Done by Cube Systems