• Saturday, 23 November 2024
Bislimoski: 300 MW of renewable energy capacity to be connected to grid in 2023

Bislimoski: 300 MW of renewable energy capacity to be connected to grid in 2023

Skopje, 29 April 2023 (MIA) - The Energy and Water Services Regulatory Commission (ERC) president an...

Image